Jon Mallia Podcast

Snapshot · Jon Mallia Podcast

IL-KAVALLIERI KELLHOM EGO KBIR | Tonio Mallia

Explore episode Jul 6, 2026

Where this was said

Il-Mużew tal-Katridral

At 1:35:17 · chapter starts 1:25:44

The most ambitious project in the Foundation's history is also the most hidden: a new underground museum being built directly beneath St John's Co-Cathedral. The project began in 2018 with an archaeological excavation that made significant finds. Construction was then paused by COVID before restarting; the main construction phase was completed in 18 months, which Tonio describes as remarkable given the complexity. The architectural centrepiece is a vaulted ceiling that echoes the Cathedral nave above, with each pre-cast concrete rib weighing approximately 150 tonnes. The design deliberately rhymes with the historic Cathedral structure — continuity across four and a half centuries of architecture. Mechanical, electrical, and engineering fit-out continues, and completion is expected around 2028. Critically, the entire project is funded by the Foundation itself — no government money is involved — a fact Tonio is quietly proud of.

Similar snapshots